SMS Elotherm. Tung Ho Steel orders new induction booster EloHeat™
25.07.2013, 17:47Tung Ho Steel has ordered a new induction system from SMS Elotherm, Germany, for its production plant for medium and large sections in Miaoli, Taiwan. With the new induction reheater, Tung Ho Steel is achieving a huge reduction in heavy oil consumption, while reducing emissions at the same time. This ecoplants concept allows for rapid reheating of various materials and sizes.
“In contrast to the through-feed mode in the minimill featuring Continuous Mill Technology (CMT™), the induction coils are heated in one oscillation mode,” says Dr. Opezzo. The beam blanks, blooms or slabs are conveyed from the walking beam furnace into the induction reheating system EloHeat™, where they oscillate back and forth inside the induction coils and very quickly reach a temperature of more than 200 °C before entering the downstream rolling process.
“Depending on the steel bar’s geometry, the oscillation process only takes between two and five minutes,” says Dr. Guido Opezzo from SMS Elotherm. “Since the induction process generates the heat directly inside the steel, it is a very quick process which inhibits the formation of scale.”
The 19.2-MW system is powered by four medium-frequency transistor converters with a rating of 4,800 kW each. To reach the most suitable temperature for the downstream rolling process, the energy introduced into the sections can be adapted. To achieve this, Laser-Doppler speed measurement devices, in combination with optical pyrometers, are therefore used to control the process.
Capacity to reheat a variety of geometries
The entire product mix covers various materials and geometries, ranging from 480 X 430 beam blanks to 1250 X 220 slabs, all between four and ten meters long. This wide variety of geometries can be reheated with only three different types of inductor sets. Combined with the Elotherm quick inductor changeover system, the
lowest possible downtimes can be ensured.
The new reheating line is scheduled to be commissioned in the third quarter of 2014.
Henry Ho, President of Tung Ho Steel (right), and Dr. Andreas Seitzer of SMS Elotherm, shake hands at the official contract signing ceremony.
Based on SMS Group information
Other company news
- 19.07.2018 For its tandem cold mill, PAO Severstal again relies on the modernization expertise of SMS group
- 10.07.2018 Vizag Steel Plant successfully commissions new bloom & round combi-caster from SMS Concast
- 05.07.2018 exlabesa group commissions SMS group to supply two light-metal extrusion presses
- 14.06.2018 350,000 tons per year of galvanized steel strip for the Chinese construction and home appliances industries
- 14.06.2018 Yongfeng Group Ltd. invests in casting technology for the production of demanding SBQ steel grades
- 26.04.2018 Celsa Barcelona chooses direct oscillation drive from SMS Concast for the upgrade of their beam blank caster with a new strand
- 12.04.2018 TMK-ARTROM starts production on new heat treatment line for pipes supplied by SMS group
- 12.04.2018 Constellium expands aluminum casthouse capacity in Dĕčín, Czech Republic, with Hertwich Engineering homogenizing furnace
- 29.03.2018 Maanshan Iron and Steel orders heavy section mill from SMS group
- 26.03.2018 MMK to implement comprehensive revamp of hot strip mill 2500 with SMS group


