APPLIED RESEARCHES
Название Stability estimation in underground opening with support system using finite–discrete element method-based modeling
DOI 10.17580/gzh.2023.01.20
Автор Ilyasov B. T., Kulsaitov R. V., Neugomonov S. S., Soluyanov N. O.
Информация об авторе

VNIMI’s Ural Division, Yekaterinburg, Russia:

B. T. Ilyasov, Head of Laboratory, Candidate of Engineering Sciences, bt.ilyasov@gmail.com

 

Nosov Magnitogorsk State Technical University, Magnitogorsk, Russia:

R. V. Kulsaitov, Associate Professor, Candidate of Engineering Sciences

 

Ural EnergoResource, Magnitogorsk, Russia:

S. S. Neugomonov, Chief Technical Officer, Candidate of Engineering Sciences

 

Nornickel Technical Services, Saint-Petersburg, Russia:

N. O. Soluyanov, Chief Geomechanic

Реферат

The article substantiates the relevance of modeling rock bolt support by the finite–discrete element method for calculating stability of underground mine workings. The mechanics of 1D elements implemented in Prorock program is described. For the real conditions of an underground mine, the method for determining the permissible parameters of support is shown, taking into account the influence of the mining area. The parameters of the artificial stress field were found from the numerical simulation of mining using three different schemes. Schemes 2 and 3 showed more realistic and closer to each other results. Scheme 2 is a finite element simulation with an explicit specification in the caving arch model based on empirical calculations. Scheme 3 assumes modeling by the finite–discrete element method. Scheme 1 shows how the use of FEM can lead to an underestimation of the predicted induced stresses when simulating mining with caving. FDEM modeling of mine workings in various conditions made it possible to determine permissive provisions for the use of compound support systems based on self-attaching frictional rock bolts (manufactured by Ural EnergoResource, Magnitogorsk). The conditions for ensuring stability during construction of mine workings in heavily disturbed and fractured rock masses are demonstrated taking into account the influence of the stoping area. The examples show that, in contrast to FEM, the FDEM models can distinguish between the conditions under which a mine working is in the limiting state and under which it fails. Due to this, the stability reserve as a result of the simulation is determined more accurately, which makes it possible to optimize the parameters of mine support systems based on the FDEM simulation. A case-study describes how FDEM-based modeling allows finding conditions for using a more economical method of supporting underground excavations in comparison with the techniques adopted in the mine.
The study was carried out in cooperation with M. V. Kotik, Project Group Manager at Ural EnergoResource, Magnitogorsk, Russia.

Ключевые слова Rock bolt support, self-attaching frictional rock bolt, finite–discrete element method, finite element method, stress–strain behavior, rock fracturing, failure, post-limiting deformation
Библиографический список

1. Liskovets A. S., Tatsienko V. P. Analysis of support and tamping methods of the behind-anchoring space of mine workings and methods for calculating the interaction of the support with the rock massif. Tekhnika i tekhnologiya gornogo dela. 2021. No. 1(12). pp. 27–52.
2. Lushnikov V. N., Sandy M. P., Eremenko V. A., Kovalenko A. A., Ivanov I. A. Method of definition of the zone of rock massif failure range around mine workings and chambers by numerical modeling. Gornyi Zhurnal. 2013. No. 12. pp. 11–16.
3. Rumyantsev A. E., Trofimov A. V., Vilchinsky V. B., Marysiuk V. P. Finite-element analysis as a means of solving geomechanics problems in deep mines. Geomechanics and Geodynamics of Rock Masses : Proceedings of the 2018 European Rock Mechanics Symposium. Leiden : CRC Press/Balkema, 2018. pp. 895–902.
4. Lisjak A., Young-Schultz T., Li B., He L., Tatone B. S. A. et al. A novel rockbolt formulation for a GPU-accelerated, finite-discrete element method code and its application to underground excavations. International Jo urnal of Rock Mechanics and Mining Sciences. 2020. Vol. 134. 104410. DOI: 10.1016/j.ijrmms.2020.104410
5. Trofimov A. V., Kirkin A. P., Rumyantsev A. E., Yavarov A. V. Use of numerical modelling to determine optimum overcoring parameters in rock stress-strain state analysis. Tsvetnye Metally. 2020. No. 12. pp. 22–27. DOI: 10.17580/tsm.2020.12.03
6. Tyupin V. N. Estimation of critical depth of deposits by rock bump hazard condition. Journal of Mining Institute. 2019. Vol. 236. pp. 167–171.
7. Kandaurov I. I. Mechanics of Granular Media and Constructional Application. 2nd revised and enlarged edition. Leningrad : Stroyizdat, 1988. 280 p.
8. Stavrogin A. N., Tarasov B. G. Experimental physics and mechanics of rocks. Saint-Petersburg : Nauka, 2001. 343 p.
9. Fairhurst C., Cook N. G. W. The Phenomenon of Rock Splitting Parallel to the Direction of Maximum Compression in the Neighborhood of a Surface. Proceeding of the 1st Congress of the International Society of Rock Mechanics. Lissabon, 1966. pp. 687–692.
10. Makarov A. B. Practical geomechanics: guidance for mining engineers. Moscow : Gornaya kniga, 2006. 391 p.
11. Munjiza A. The combined finite-discrete element method. Chichester : John Wiley & Sons Ltd, 2004. 350 p.
12. Ilyasov B. T. Rock mass deformation kinetics analysis using the finite–discrete element method : Thesis of Dissertation of Candidate of Engineering Sciences. Yekaterinburg, 2016. 138 p.
13. Lisjak A., Grasselli G. A review of discrete modeling techniques for fracturing processes in discontinuous rock masses. Journal of Rock Mechanics and Geotechnical Engineering. 2014. Vol. 6, Iss. 4. pp. 301–314.
14. Stead D., Eberhardt E., Coggan J. S. Developments in the characterization of complex rock slope deformation and failure using numerical modelling tech niques. Engineering Geology. 2006. Vol. 83, Iss. 1-3. pp. 217–235.
15. Ilyasov B. T. Prognostication of rock mass deformations with using PROROCK software. Problemy nedropolzovaniya. 2018. No. 1. pp. 39–51.
16. Živaljić N., Nikolić Ž., Smoljanović H. Computational aspects of the combined finite–discrete element method in modelling of plane reinforced concrete structures. Engineering Fracture Mechanics. 2014. Vol. 131. pp. 669–686.
17. Weiqin Wang, Quansheng Liu, Hao Ma, Haifeng Lu, Zhongwei Wang. Numerical analysis of material modeling rock reinforcement in 2D FDEM and parameter study. Computers and Geotechnics. 2020. Vol. 126. 103767. DOI: 10.1016/j.compgeo.2020.103767
18. Barton N. Shear strength criteria for rock, rock joints, rockfill and rock masses: Problems and some solutions. Journal of Rock Mechanics and Geotechnical Engineering. 2013. Vol. 5, Iss. 4. pp. 249–261.
19. Louchnikov V. N., Eremenko V. A., Sandy M. P., Kosyreva M. A. Support Design for Mines Exposed to Rockburst Hazard. Journal of Mining Science. 2017. Vol. 53, No. 3. pp. 504–512.
20. Volkov P. V., Kulsaitov R. V., Magitov A. M. Technology for fixing mine workings with friction anchors of the SZA type with a new type of anticorrosive coating. IOP Conference Series: Materials Science and Engineering. 2020. Vol. 966. 012017. DOI: 10.1088/1757-899X/966/1/012017
21. Zubkov A. A., Neugomonov S. S., Volkov P. V. Improvement of mine support technology with frictional rock bolts in difficult geological conditions. Mining Industry in the 21st Century—Challenges and Reality : Proceedings of Int. Conference to Commemorate ALROSA Yakutniproalmaz Institute’s 60th Anniversary. Mirny : Pero, 2021. pp. 102–103.
22. Temporal guidance on conservation of constructions and natural objects from harmful impact of underground mining of non-ferrous metals deposits with unstudied process of rock movement. Leningrad : VNIMI, 1986. 74 p.

Language of full-text русский
Полный текст статьи Получить