DEVELOPMENT OF DEPOSITS | |
Название | Method for mining steeply dipping thin lodes |
DOI | 10.17580/gzh.2016.12.10 |
Автор | Eremenko V. A., Barnov N. G., Kondratenko A. S., Timonin V. V. |
Информация об авторе | Institute of Integrated Mineral Development — IPKON, Russian Academy of Sciences, Moscow, Russia: V. A. Eremenko, Leading Researcher, Professor of RAS, Doctor of Engineering Sciences, eremenko@ngs.ru
Institute of Mineralogy, Geochemistry and Crystal Chemistry of Rare Elements, Moscow, Russia:
Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk, Russia: |
Реферат | For complicated geological and geotechnical conditions of steeply dipping thin lodes, a method has been developed, including bench mining with drilling and blasting (hydraulic blasting) and simultaneous backfilling with barren rocks. Concurrent mining on three (four) sublevels, sequence of preparation of an extraction panel and actual stoping enables continuous operation and enhanced efficiency of the geotechnology. Mechanized backfilling with barren rocks minimizes costs of barren rock transportation and disposal. This geotechnology is aimed at the most complete extraction of minerals with the raise mining starting from the lower boundary of an ore body (block). The proposed geotechnology eliminates crown pillars and stress concentration zones. A block of an ore body is divided into 4 sublevels with 8 work faces. In accessing, the length of retreat mining from sides to the center of the block is shortened, e.g., to 125 m, with regard to physical properties of ore and enclosing rocks. Mining efficiency is ensured by: high production output of the mining system; feasibility of concurrent operation on 3–4 sublevels; drilling and charging of holes from the upper lying drift on a sublevel; application of advanced drilling equipment designed at the Institute of Mining, Siberian Branch, Russian Academy of Sciences; no need in crown pillars; capability to carry out stoping in unstable enclosing rocks of hanging wall owing to cable rock bolting; safe remote loading of broken ore in production face area, etc. The full-scale research in mines show that in ore heading with drilling and blasting and ore handling in excavations driven in footwall, ore dilution makes 5 %; under condition that blasting is directed toward backfill, this dilution value should be added with 40 % in the first blast row and 20 % in the second blast row. |
Ключевые слова | Steeply dipping thin lodes, mining method, excavation, hole, backfill, cable rock bolt, explosive charge, hydraulic blast, ore dilution |
Библиографический список | 1. Barnov N. G., Eremenko V. A., Kondratenko A. S., Timonin V. V. Substantiation of parameters of geotechnology for mining primary corundum deposits in difficult working conditions in upland areas. Gornyi Zhurnal. 2015. No. 11. pp. 42–47. doi: 10.17580/gzh.2015.11.09 |
Language of full-text | русский |
Полный текст статьи | Получить |