Журналы →  Obogashchenie Rud →  2021 →  №1 →  Назад

FOREIGN EXPERIENCE
Название Designs of new operating copper processing plants: process types, equipment selection, industry trends
DOI 10.17580/or.2021.01.08
Автор Baranov V. F.
Информация об авторе

«Mekhanobr Engineering» JSC (Saint-Petersburg, Russia):

Baranov V. F., Head of Department, Doctor of Engineering Sciences, viktorbaranov@list.ru

Реферат

The article describes the largest operating processing plants for lowgrade copper sulphide ores of our time: 10 plants using the semi-autogenous grinding (SAG) technology and 10 plants using high-pressure grinding rolls (HPGR), with the output of 18 to 100 Mtpa. The unfavorable natural and economic factors are balanced by improved ore preparation and concentration technologies and high-capacity equipment units, combined with cost-saving layout solutions. The ore preparation sector is currently divided between the competing technologies of semi-autogenous grinding and HPGR. The article contains an overview of their advantages and disadvantages. The world’s largest monosection with the capacity of 55.5 Mtpa, that uses the SAG technology, is described. The role of the Drop Weght Test JKSimMet (A×b) parameter in the selection of the ore preparation method and the trend for using HPGR in the processing of strong ores are shown. Examples are provided for the consequences of an inadequate assessment of the feed strength in SAG-based plant designs. Examples of ore preparation process intensification through the use of HPGR in semi-autogenous grinding circuits are also given. The volume of impeller flotation cells installed has reached 600 m3. An overview of the two largest processing plants of our time with the output of 88 and 100 Mtpa of ore is presented. The innovative technical solutions of a newest low-capacity copper plant are highlighted. Based on the results of the overview, a future processing plant is predicted to use ∅12.8–13 m SAG mills, HPGRs with the roll diameter of 3 m, vertical VTM-7000 mills in ore grinding cycles, large fine screens, large-scale impeller flotation cells, and staged SFR and DFR flotation reactors.

Ключевые слова Copper ores, ore preparation, semi-autogenous grinding, pre-crushing, pebble crushers, HPGR, layout, monosection, large-scale flotation cells
Библиографический список

1. Sánchez L. Centinela — Site visit. Antofagasta Minerals, December 7, 2016. 31 p.
2. Toromocho Independent technical review update report (Behre Dolbear project 12-284). Greenwood Village: Behre Dolbear Group Inc., 2012. 311 p. URL: https://www1.hkexnews.hk/listedco/listconews/sehk/2013/0118/03668_1526666/e132.pdf (accessed: 01.02.2021).
3. URL: www.kazminerals.com
4. Welhener H., Labrenz D., Huang J. Mt. Milligan project resource report, Omenica mining district: technical report (NI 43-101) prepared for Terrane Metals Corp. Independent Mining Consultants Inc., 2007. 113 p.
5. Declaración de impacto ambiental. Proyecto modificaciones Mina Ministro Hales, Codelco-Chile. Knight Piésold, Noviembre 2009. 107 p.
6. Antapaccay del proyecto a la operación. Proyectos en construcción, confianza en el future. Glencore, September 2013. 29 p.
7. Albright J. Las Bambas project. Xstrata, October 2012. 18 p.
8. Escondida copper, gold and silver mine, Atacama desert. URL: https://www.mining-technology.com/projects/escondida/ (accessed: 03.02.2021).
9. URL: https://www.lycopodium.com/case-studies/cobre-panama-project/ (accessed: 03.02.2021).
10. Orser T., Svalbonas V., Van de Vijfeijken M. Conga: the world’s first 42 foot diameter 28 mw gearless sag mill. 15 р. URL: https://library.e.abb.com/public/e23fc5fb2ee49033c125793d0056bce5/CONGA%20-%20THE%20WORLDS%20FIRST%2042%20FOOT%20DIAMETER%2028%20MW%20GEARLESS%20SAG%20MILL.pdf (accessed: 03.02.2021).
11. Operating and maintenance Teniente SAG mill Nо. 1. Presentation. International workshop «Improving energy efficiency in the APEC mining industry», 21–23 October 2004, Santiago, Chile. Session 1: Best practices and case studies on mineral extraction and processing operations. pp. 23–47.
12. Baranov V. F. Specialties of design-and-spatial-layout solutions and start-up problems of modern concentrating plants ore-preparation circuits. Obogashchenie Rud. 2013. No. 1. pp. 3–10.
13. Von Michaelis H. Real and potential metallurgical benefits of HPGR in hard rock ore processing. Proc. of the Randol innovative metallurgy forum, Perth, Australia, 21–24 August 2005. pp. 31–39.
14. URL: https://im-mining.com/2016/09/13/maximising-comminution-efficiency-and-reducing-costs (accessed: 01.02.2021).
15. Vaisberg L. A., Ustinov I. D. Introduction to the technology for the separation of minerals. St. Petersburg: Publishing house «Russian Collection», 2019. 168 p.
16. Estudio de impacto ambiental «Proyecto de sulfuros primaries». Asiento Minero Cerro Verde — Uchumayo Arequipa Perú. Resumen ejecutivo. Preparado para Sociedad Minera Cerro Verde S. A. A. 14 de junio del 2004. 326 p.
17. SME mineral processing and extractive metallurgy handbook. In 2 vol. Englwood, Colorado, USA: Society for Mining, Metallurgy & Exploration, 2019.
18. URL: www.tomsgroup.ru.
19. Hart S., Rees T., Tavani S., Valery W., Jankovic A. Process integration and optimisation of the Boddington HPGR circuit. SAG Conference, 25–28 September 2011, Vancouver, Canada. Paper No. 126. 16 p.
20. Rodrigues A. R. Estudo de caso: moagem semiautógena e de bolas. Monografia … comorequisito para obtenção do título de Especialista em Beneficiamento Mineral. Universidade Federal de Ouro Preto, 2010. 80 p.
21. Osmond J. C., Foo B., Turner J., Jacobs C. Technical report on the mineral reserves and mineral resources of the Salobo copper-gold mine, Carajás, Pará State, Brazil. Micon for Silver Wheaton Corp. 19 March 2013.
22. Gardula A., Das D., DiTrento M., Joubert S. First year of operation of HPGR at Tropicana gold mine — case study. CUPRUM – Czasopismo Naukowo-Techniczne Górnictwa Rud. 2015. Nr 2. ss. 15–36.
23. Results of the KGHM Polska Miedź Group in the first half of 2014. KGHM Polsca miedz S. A., 4 August 2014. 39 p.
24. EIA ampliación de la concentradora Toquepala y recrecimiento del embalse de relaves de quebrada Honda. 3.0 Descripción del Proyecto. Southern Peru Copper Corporation, July 2011. 33 p.
25. Cadia east project — Environmental assessment. Cadia Holdings Pty Ltd, June 2009.
26. JKTech laboratory services. JK drop weight test. JKTech Pty Ltd, July 2014. 3 p.
27. Petaquilla cost update. World of Mining Professionals (WOMP). 2007. Vol. 1. Story 035.
28. Franzese L. A. G., de Oliveira Mota D., Fioroni M. M., Ribeiro F. S., Silva M. N., Fernando A. Lage Gonçalves F. A. L., Mourão Yu. A. C. L., da Silva D. J., Santana I. R., Quevedo J. G., Diniz T. A. M. B., Gomes M. B. Maintenance framework to address the interaction of components using simulation. Proc. of the Winter simulation conference, 11–14 December 2011, Phoenix, AZ, USA. pp. 728–740.
29. Kerr-Sulfurets-Mitchell (KSM) comminution circuit energy comparison between HPGR circuit and SABC circuit. Report to Seabridge Gold Inc. Tetra Tech Wardroup, August 2012. 396 p.
30. Morrison project. HPGR trade-off study. Document No. 0652720100-REP-R0004-02. Report to Pacific Booker Minerals Inc. May 2008. 68 p.
31. Ajax project. NI 43–101 Technical report. Feasibility study update. British Columbia, Canada, February 19, 2016. 353 p.
32. Management presentation. Adanac Molybdenum Corporation, October 2008.
33. Metso UltraFine screen (UFS). Screening solutions. Metso, 2016. 4 p.
34. Development project of the Koktaszhal deposit. Environmental and social policy. Karaganda: PSI Engineering, Altay polymetals, 2014. pp. 28–29.
35. Heffernan V. A staged start-up. The journey to successful scale-up for Woodgrove Technologies’ innovative three-stage flotation reactor. CIM Magazine. 2018. Vol. 13, No. 3. pp. 46–49.
36. NI 43-101 Technical report on Quebrada Blanca Phase 2. Feasibility study 2016. Región de Tarapacá, Chile. Vancouver: Teck Resources Ltd, 2017. 222 p.

Language of full-text русский
Полный текст статьи Получить
Назад